345kV Samcheok Thermoelectric power plant T/L No.1,2 Construction Electrical Supervision ServiceGundeok-myeon, Nogok-myeon, Singi-myeon, Samcheok-si, Gangwon-doLine section: Samcheok Force Power T/P SWYD to 765kV Shintaebaek S/S, Line length: 31.4km, Tower quantity: 72Proceeding
154kV Waegwan-Dasa Disruptive T/L Relocation Construction Supervision Service Myori, Habin-myeon, Dalseong-gun, DaeguLine section: 154kV Waegwan-Dasa T/L No.16~19, Line length: 1.882km, Installation of 6 towers (including 3 temporary towers), requidation of 6 towers (including 3 temporary towers)Proceeding
Relocation and Underground T/L Construction of Disruptive T/L(154kV Hongwon Paper Mfg.) in Osan Segyo District 2Beolum-dong, Osan-si, Gyeonggi-doLine section: Hongwon Paper Mfg. T/L No. 1 to No. 9, Overhead T/L Construction: Installation of 6 Towers (2.4 km), Demolition of 13 Towers (1.17 km), Underground T/L facilities: 1.664km Conduit, 4 manholesProceeding
345kV Anin, Gangreung Thermoelectric Power Plant No.1,2 Construction Electrical Supervision Service Gangdong-myeon, Gangneung-si, Gangwon-doLine Section: 345kv the East SeaS/S to Yangyang P/P, Line length: 26.6km(Overhead 11km, Underground 2.3km), Tower quantity: 29Proceeding
T/L Supervision Service for Yeoju Natural Gas Power Plant ConstructionYeoju-si, Gyeonggi-doLine section: Yeoju natural gas power plant ~ 154kV Munmak-Kei T/L 68, track length: 25.6km, pylon quantity: 18 unitsProceeding
Page 1 of 8 (40 items)Prev12345678Next
 

JinKwang Construction Engineering

Electric Facilities. Safety Inspection Part. Social Works

Contact Us

  • 4th Floor. ShinHyup Building
  • 1016 GyeongSu-DaeRo SongJuk-Dong JangAn-Gu Suwon-City Gyeonggi-do Korea
  • Phone: + 82 (31) 246 3141
  • Mail: jkc3141@daum.net

2020 © All Rights Reserved. JinKwang Construction Engineering